Environmental Impact Assessment for Paks II, Hungary

At the nuclear site Paks, approximately 100 km south of Budapest, the only Hungarian Nuclear Power Plant is located on the right bank on the Danube. On this site, two additional reactor units (Paks II) are planned to be built with 1,200 MWe each. Operation time is planned for 60 years, with the start of the commercial operation in 2025 and 2030 respectively.

In 2015, the main step of the transboundary EIA procedure started.
In the Joint Project, we produced a statement which can be downloaded here.
On 23 Sept, 2015 a public hearing was held in Vienna. Minutes can be downloaded here.

Oda Becker prepared an expert statement for Greenpeace Germany, it can be downloaded here.